Ready to buy preconstruction? Click here to Get our preconstruction investment and buyer’s guide today.
Burlington
2024
$500K
253 / 26
ADI complex Group is presently building Nautique Lakefront Residences, a new condominium complex in the Brant-Maple Beachway neighborhood of Burlington, which has an 85/100 walk score and a 27/100 transit score. The property is situated at 374 Martha Street. The interior design of Nautique Lakefront Residences is by Cecconi Simone, while the building is designed by ICON Architects Inc. The development is expected to be finished in 2024.
Adi Development
$500,000
2024
374 Martha St, Burlington
26 Storeys / 253 Suites
Studio-2 Bedroom+ Den
494 - 993 Sq Ft
$0.68/sqft
Running, hiking, and bicycling are particularly well-suited to the pathways and paths that wind through the nearby parks and along the shore.
Burlington is serviced by both the 407 and the QEW. Pearson Airport can be reached in less than thirty minutes from the Burlington GO Station.
Over the next 30 years, Burlington's present population of over 187,000 is expected to rise dramatically, as the Halton Region aims to increase the population by 85% to over 1.1 million.
Nautique residents enjoy lakeside living with stunning views. Shops, offices, pubs, cafés, Spencer Smith, Lions, Brock, and Apeldoom Parks are nearby.
Nautique residents enjoy lakeside living with stunning views. Shops, offices, pubs, cafés, Spencer Smith, Lions, Brock, and Apeldoom Parks are nearby.
Burlington is serviced by both the 407 and the QEW. Pearson Airport can be reached in less than thirty minutes from the Burlington GO Station.
ADI Developments has shaped the GTA since 2007 via real estate investment, planning, design, development, and management. ADI Development takes pleasure in showing enthusiasm and energy in every phase of their residential and commercial real estate development projects in the area.